Quote:
Originally Posted by LOA--Paul View Post
Yeah but most corporations already have some sort of cycle time and accountability in place production wise for projects like this. Cyberjouers is highly atypical in that aspect so who knows what they will do.
So either you think it is a democratic nation, and your proof is terrible, or your rebuttal is irrelevant to my statement and shouldn't have a "but". I simply stated that mystic's analogy is wrong.

Quote:
Originally Posted by LOA--Paul View Post
The job should be seen as 'project manager' rather than 'scripting/levels manager'. Right now, it's basically head LAT with some other RC rights. I dont see a lot of actual oversight going on. Most of what it takes shouldnt really take RC rights besides to verify what was done by others. Manager should be keeping track of things in excel and using other methods. Everyone should have some specific assignments (with enough leeway to get good original approved side projects going)
No, Thor should be the one with the spreadsheet as the development administrator. The manager should oversight the team leads and make sure they are doing what they are supposed to do. If you think Thor is doing a good job, Night is doing a good job, and Stryker is doing a good job, then by default you think Storm is doing a good job, since that is his position. If you are unsatisfied with one of the three listed above, then Storm is doing a less then perfect job by not replacing them.